|
|
Personal Information |
|
|
First/Last name |
Ionel Teodor |
|
Address |
8, . Tunsului
street, Tulcea, Romania |
|
Mobile phone |
0741564177 |
|
Email |
iteodorperrot@yahoo.com |
|
Birth date |
19-01-1960 |
|
Gender |
Male |
|
Last login |
16 decembrie 2009 |
|
Date of last modification |
16 decembrie 2009 |
|
Work experience |
|
|
|
|
Career level |
Senior-level
(over 20 years) |
|
|
|
Experience by domains |
Chemical Engineering - 5 years Piping - 8 years Metallurgy/Mining -
12 years Petrochemistry/Oil and Gas - 5 years |
|
|
|
Management experience |
Yes |
|
|
|
Job |
Engineering,
Power Manager |
|
Period |
2008-10 <>
present |
|
Name and address of the employer |
feral, tulcea |
|
Department |
Project Management, Installation, Maintenance and Pipes Repairs |
|
Job description |
The company has
500-1000 employees. - drawing and lead mechanical and
thermal projects for ½ to 40 inches pipelines and valves in diameter, niples and welding points ( PP and steel ); calculation
for pumps and engines and chose them; chosing and mounting the flowmeters and manometers;
-lead the resources : material ( quantities / quality), human resources ( type, number, work-hours
per operation), financial resources
);
-establish and
maintain business contacts with suppliers (mail, phone, visits in them plants); used SAP for bussines supliers;
-reception parts and elements of project :quantity, quality;
-acceptance/rejection bills to pay; counting bills for financial balance of investment; sent the
report to financial management;
- commissioning sevices periodically/final; work procedures editing;
- personnel training for work procedures;
- contacts with the plant management by SAP soft (mailed reports or phone call ); - thermal
and hydraulical mounting for reactors. |
|
Job |
Engineering, Manager
of Mechanical, Power and Investment Department |
|
Period |
2007-03 <>
2008-06 |
|
Name and address of the employer |
tremag, tulcea |
|
Department |
Management/Consulting |
|
Job description |
The company has
250-500 employees.
- drawing, hydraulical mounting in all plant : hydraulic pipelines, transport by pumps automation:
·
calculation of pressure drop in pipeline;
·
calculation of local resistances;
·
ded pipeline network calculation series / parallel;
·
calculating the resistance of the pipes and elbows (thickness determination,
choice pipes). Evidence of internal pressure;
·
calculation and choice of pumps and engines;
·
determining the number of stations for heating oil storage terminal
in vessels;
·
checking welds, mounting fittings, valves and flow regulators;
·
installation, dismantling and maintenance of transportation systems;
- drawing, mounting of waste water and rain : hydraulical, power and automation ; - resources
management. - monthly databases for repairs and maintenance.
|
|
|
|
|
|
|
Job |
Project manager,
Production manager |
|
Period |
1996-11 <>
2006-12 |
|
Name and address of the employer |
SC ALUM SA TULCEA |
|
Department |
Project Manager.
Process Supervisor |
|
Job description |
The company has
1000-3000 employees. Responsibilities, Achievements -
drawing, hydraulical mounting in all plant : hydraulics, pumps automation:
·
calculation of pressure drop in pipeline;
·
calculation of local resistances;
·
ded pipeline network calculation series / parallel;
·
calculating the resistance of the pipes and elbows (thickness determination,
choice pipes). Evidence of internal pressure;
·
calculation and choice of pumps and engines;
·
determining the number of stations for heating oil storage terminal
in vessels;
·
checking welds, mounting fittings, valves and flow regulators;
· installation, dismantling and maintenance of transportation systems;
- drawing mechanical projects for alumina process ( pre-desilication flow, optimising for thermal
and chemical reactors, polimer dosing, draw belt transmission, gears, electrical engines, compressors);
-lead the resources : material ( quantities / quality), human resources ( type, number, work-hours
per operation), financial resources
);
-establish and maintain business contacts with suppliers
(mail, phone, visits in them plants); used SAP for bussines supliers;
|
|
Job |
Process Manager,
Oil an Gas Engineer |
|
|
Period |
1985-09 <>
1990-10 |
|
|
Name and address of the employer |
IFLGS Bucharest |
|
|
Department |
Petrochemistry/Oil and Gas |
|
|
Job description |
The company has 1000-3000 employees. Responsibilities, Achievements Rigs: T50 for drilling
at 800 meters, F125-2DH for 2900 – 3200 m, F200-2DH for same well oil drillings. Casing and cementing full hole or liners.
I use a large area of tools in drilling process, preparing of drilling mud, cementing and casing. Used rotary or russian or
navy drill turbines. Used different tools for instrumentation. Pumps – volumic, Duplex 2PN 400, 2PN 700.
|
|
|
|
|
|
|
Education and training
|
|
|
|
Period |
Graduation date: 2001 |
|
|
Institution
Obtained diploma |
Miscarea Romana pentru Calitate
Internal audithor
|
|
|
Description (specialization) |
Oil and Gas University
Chemical Engineering |
|
|
Obtained diploma |
Dipl.
engineer |
|
|
Period |
1980 - 1985 |
|
|
Institution |
Petrochemical Engineering Faculty |
|
|
City |
Ploiesti |
|
|
|
IWCF Certificate |
|
|
|
|
|
|
|
|
|
|
Personal skills and competences |
|
|
|
Foreign Languages |
French - advanced; English - Advanced; |
|
|
Driving license |
Yes |
|
|
Skills |
Project Management
Piping Management
Thermical Power
Optimisation Chemical Processes
Geological, Oil
and Gas Drilling Mechanical Drawing Hidraulical IT - soft & hard Production management |
|
|
Other activities |
Projects
management Large activity in well oil
and gas : geological and well oil drilling; piping, casing, cementing. Large activity in the hydraulical, chemical (macromolecular)
and thermal research.
Costs analises. Analises of optimal parameters
in processes. Plastic injection - pumps : pistons, giratory, plunger. Vaacum pumps. Hobbies Computers/Internet,
Tourism/Excursions, Literature, Sports |
|
|
|
|
|
|
Additional information |
|
|
|
Mobility |
I am willing to
relocate in the country and abroad. |
|
|
|
I am available
for business travel 50% from my working time. |
|
|